by Markus Erlmann | 07 May 2010
This is not an easy task as the amount of information to take into account is huge. Starting with architectural information like the plant layout to libraries of standard manufacturing equipment which can be used to build the products to the required output of the manufacturing lines.
In addition there are a lot of people from different departments involved which need to communicate to finally get an optimized, reliable and well functioning factory.

In a previous blog post Brad Whitmore from Procter & Gamble described how he and his team solved this challenge.
Tags:
tecnomatix |
Tecnomatix |
Plant Design and Optimization |
FactoryCAD |
Layout Planning |
Page 1 of 1 pages
Susan Cinadr on Maintenance pack (MP1) for Solid Edge with synchronous technology 2.
CNC Blechbearbeitung on Maintenance pack (MP2) for Solid Edge with synchronous technology 2.
Balkrishna on Maintenance pack (MP1) for Solid Edge with synchronous technology 2.
Dehydration symptoms on Early indicators are positive.
Ian Webb on Announcing Solid Edge With Synchronous Technology 2.
Mike Payne on Announcing Solid Edge With Synchronous Technology 2.
David Breitstein on Get to the point!.
Alastair Robertson on Produce “spectacular rainbow-colored images”.
5800 Granite Parkway
Suite 600
Plano, TX
75024
(v): +1 800 498 5351