Entries Tagged: Shop Floor
by Markus Erlmann | 01 Sep 2009
Have you ever had the opportunity to visit the shop floor of a manufacturing company? I have … to be more specific, I worked on an assembly line for textile machines before I studied mechanical engineering at the University of Karlsruhe (Germany). I was fascinated with the traffic on the shop floor – all of the forklifts driving around and the amount of workers carrying material from one workstation to another. Of course this was more than 20 years ago.
Today companies optimize material flow to reduce transportation, which is one of the seven wastes targeted by lean manufacturing practices. Reducing inventory costs and transportation devices can be achieved as well. The optimization of material flow can be a complex task that is influenced by many factors, like cycle time and required number of parts per hour, number and type of transportation devices, storage space at the line, delivery concepts like just-in-sequence and much more.
Tags:
tecnomatix |
Tecnomatix |
Simulation |
simulation |
productivity |
Productivity |
Manufacturing |
Plant Design and Optimization |
Material Flow |
Shop Floor |
Page 1 of 1 pages
Susan Cinadr on Maintenance pack (MP1) for Solid Edge with synchronous technology 2.
CNC Blechbearbeitung on Maintenance pack (MP2) for Solid Edge with synchronous technology 2.
Balkrishna on Maintenance pack (MP1) for Solid Edge with synchronous technology 2.
Dehydration symptoms on Early indicators are positive.
Ian Webb on Announcing Solid Edge With Synchronous Technology 2.
Mike Payne on Announcing Solid Edge With Synchronous Technology 2.
David Breitstein on Get to the point!.
Alastair Robertson on Produce “spectacular rainbow-colored images”.
5800 Granite Parkway
Suite 600
Plano, TX
75024
(v): +1 800 498 5351